ENTERTAINMENT, ARTS, ENGINEERING BUILDING 72 PHASE 1 REMODEL

UNIVERSITY OF UTAH

UNIVERSITY OF UTAH
EAE BUILDING 72
PHASE 1 REMODEL

332 1400 E,
Salt Lake City, UT 84112

Subcontractor Selection – Phase 1

Owner: University of Utah
Architect: Studio LP
Gramoll Construction Contact: Dustin Gramoll
175 West 1100 North
North Salt Lake, Utah 84054
(801) 295-2341 Phone
(801) 295-2356 Fax

Bids Due: 10:00 AM on Friday, December 6, 2019 (revised in Addendum 2)

OVERVIEW

The scope for Phase 1 has been determined and includes: removal of both grand stairways and construction on a new stair.  Limited interior repair and replacement for impacts to demolition and new stairway.  Demolition and removal of existing library book carousels as per documents.

There will be a pre-bid walkthrough on 8:00 AM Friday, November 15 at the EAE Building.  Meet in the entry Lobby on the east side of Building L2.

To save a copy to your hard drive, right click the link and select “Save Link As…”

BID DOCUMENTS

Drawings (27 MB, PDF format)

Specifications (31 MB, PDF format)

 

ADDENDA

Addendum No. 1 (<1 MB, PDF format)

Addendum No. 1 – Drawings (14 MB, PDF format)

Addendum No. 2 (<1 MB, PDF format)

Please contact Dustin Gramoll if you have any questions or concerns regarding this project.

Gramoll Construction on behalf of the University of Utah and Studio LP reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the owner.

 

ABOUT US

Gramoll Construction Company provides clients with the highest quality construction…

TESTIMONIALS

What our clients are saying…

SERVICES

Gramoll Construction is dedicated to providing the best project…

CONTACT US

Get in touch with Gramoll Construction…