FINE ARTS CENTER – PACKAGE 3

UTAH STATE UNIVERSITY

 


 

FINE ARTS CENTER
KENT CONCERT HALL, TIPPETTS GALLERY
& MUSIC WING – ARCHITECTURAL

UTAH STATE UNIVERSITY
Logan, Utah 84322

Subcontractor Selection

Owner: Utah State University
Architect: Sparano + Mooney
Gramoll Construction Contact: Gary Hansen
175 West 1100 North
North Salt Lake, Utah 84054
(801) 295-2341 Phone
(801) 295-2356 Fax
Bids Due: February 2, 2016 at 2:00 PM


NOTE: The bid date for February 2nd is for drywall ONLY.  The project has limited site and building access so ALL bidders are required to visit the job site for a MANDATORY walkthrough.  The walkthrough will be be held at 10:00 AM on Thursday, January 28th.

OVERVIEW

The project consists of 3 distinct areas of the complex:

1.  Kent Concert Hall (22,000 SF).  The Kent Concert hall is being completely remodeled.  Demolition, concrete, structural steel fabrication and erection, elevator, mechanical and fire sprinkler have been bid out in BP #2. BP #3 includes miscellaneous steel, tension grid, decorative wood paneling, millwork, insulation, fire stopping, sealants, expansion joints, hollow metal doors and frames, wood doors, hardware, cold formed framing, non-structural framing, drywall, glazing, ceramic tile, acoustic ceiling tiles, sound panels, carpet, vct, painting, signage, fire protection specialties, toilet and bath accessories, theatrical and stage equipment, theatrical lighting,  audio visual equipment, sound equipment, electrical and communications.

2.  Tippetts Gallery (8,500 SF). In the Tippetts gallery demolition, concrete, mechanical and fire sprinkler have been bid out in BP #2. BP #3 will have miscellaneous steel, millwork, hardwood flooring, insulation, fire stopping, sealants, expansion joints, hollow metal doors and frames, wood doors, hardware, coiling doors, cold formed framing, non-structural framing, drywall, storefront, glazing, acoustic ceiling tiles,  painting, signage, fire protection specialties, electrical and communications.

3. Music Wing (40,000 SF).  The music wing on the project will have the ceilings removed. Demolition, mechanical and fire sprinkler have been bid out in BP #2. BP #3 includes fire stopping, sealants, non-structural framing, drywall, acoustic ceiling tiles, painting, electrical and communications.


To save a copy to your hard drive, right click the link and select “Save Link As…”

BID DOCUMENTS

Drawings (132 MB)

Specifications (5.31 MB)

Addendum #1 (8.63 MB)

Addendum #2 (27.1 MB)

Addendum #3 (5.25 MB)

Addendum #4 (4.29 MB)

Appendices A&B – Theatrical A/V Equipment List (<1 MB)

PR #5 (2.1 MB)

The documents are also available on our Dropbox here.


Please contact Gary Hansen if you have any questions or concerns regarding this project.

Gramoll Construction on behalf of the DFCM, Utah State University and Sparano + Mooney reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the owner.

 

ABOUT US

Gramoll Construction Company provides clients with the highest quality construction…

TESTIMONIALS

What our clients are saying…

SERVICES

Gramoll Construction is dedicated to providing the best project…

CONTACT US

Get in touch with Gramoll Construction…