ACC Operating Room Expansion, University of Utah

$4,700,000

Project Budget

FFKR Architects

Project Architect

7200 SF

Project Size

CM/GC

Procurement

November 2023 To January 2024

Duration

The University of Utah

Owner

OVERVIEW

The Ambulatory Care Center (ACC) Operating Room Expansion project at the University of Utah included the addition of two new operating rooms, one of which was specially fitted for robotic surgeries, both equipped with integral light and air diffusers to ensure optimal surgical conditions. It also included a new breakroom, conference room, anesthesia workroom, and trash room along with the remodel of the dirty intake room. The 7,200 SF of construction had to be executed within a sterile environment with operations ongoing throughout the process.

 

The Gramoll team implemented strategic phasing, extensive temporary protection measures, and soundproofing to minimize disruptions and maintain the integrity of the sterile environment. Phasing the project allowed for seamless transitions to temporary areas while the final space was completed. The team worked closely with the nursing staff to schedule construction activities. Through careful planning and execution, the team successfully completed the project without any interruptions to operations.

AWARDS &
TESTIMONIALS

“Having worked in healthcare for the majority of my career, I can confidently say that the Gramoll Team ranks among the top contractors I have ever encountered. Their positive attitude, cohesive teamwork, commitment to quality, and adept problem-solving skills make them a standout choice for any medical project. It was truly a pleasure collaborating with their team, and I wholeheartedly recommend Gramoll Construction for any future endeavors.”

 

-Brent Klev, Nursing Director, Ambulatory Surgery, University of Utah Health

Like what you see? Get in touch to get started.